01473 724578
Your Basket is empty
Orwell Model Railways Logo
Orwell Model Railways
Home » Products » Hornby » OO - Gauge » Train Packs » BR, Class 370 Advanced Passenger Train, Set 370 001 and 370 002, 7-car pack - Era 7
=== This product has been discontinued ===
BR, Class 370 Advanced Passenger Train, Set 370 001 and 370 002, 7-car pack - Era 7

R3874
RRP £586.99
Our Price
£393.28


Product Info

At the beginning of 1982, the CM&EE considered that development problems with the ATP-P project would mean that the introduction of APT-S, scheduled for 1988, would not happen because APT-P still required at least six more years to achieve an acceptable degree of reliability. Given this situation, a meeting of the BRB Railway Executive Group on 23 June 1982 laid out four options for the commercial introduction of APT as part an overall InterCity traction strategy, with the quickest solution being the APT-U option.

The APT-U consisted of two power cars with one at either end of the train and ten passenger cars, with a proposed increase to twelve vehicles to follow.
Tilt was to be incorporated, but not articulation.
The anticipation of the Board was for twenty trainsets to be completed for use mainly on the London to Manchester and Liverpool routes with selected operat
Product Info

At the beginning of 1982, the CM&EE considered that development problems with the ATP-P project would mean that the introduction of APT-S, scheduled for 1988, would not happen because APT-P still required at least six more years to achieve an acceptable degree of reliability. Given this situation, a meeting of the BRB Railway Executive Group on 23 June 1982 laid out four options for the commercial introduction of APT as part an overall InterCity traction strategy, with the quickest solution being the APT-U option.

The APT-U consisted of two power cars with one at either end of the train and ten passenger cars, with a proposed increase to twelve vehicles to follow.
Tilt was to be incorporated, but not articulation.
The anticipation of the Board was for twenty trainsets to be completed for use mainly on the London to Manchester and Liverpool routes with selected operation to Glasgow. As this design incorporated proven equipment and dispensed with the APT-P's transfer gearbox and HK braking, it was envisaged that service operation could begin before 1989.
In mid-1984, TS Sc48204 was withdrawn from Set 370 004 and sent to the Engineering Development Unit (EDU) at Derby RTC for conversion to an APT-U test vehicle and extensive rebuilding of the underframe being undertaken in order to incorporate tilting double bogies based on the BT12 units. Following completion, some static testing was undertaken at Derby as well as dynamic testing on the WCML in an APT formation, where the coach was inserted between the TBF and NDM vehicles.

Create a Later Fourteen Car Formation by adding the following SKUs (sold separately):

R40011A (x2)
R40012A (x2)
R40013A (x2)
R40014A (x2)

Era - 7
Gauge - 00

Manufacturer : Hornby
SKU : R3874
EAN : 5055286672194
Orwell Model Railways Ltd
Registered Offices: Ipswich Model Railway Centre, 48-52 Tomline Road, Ipswich, IP3 8DB
Registration Number: 11052594 in England & Wales
Terms & Conditions | Privacy | Contact Us | Delivery Policy | Return Policy